Data · Development projects

An airport concourse, a casino, a quantum campus.
What Chicago is building.

Every new building in Chicago starts with a city permit. Here are the largest projects permitted in the past two years, how much new housing the city has authorized since 2006, the value of construction work by year, the status of the biggest projects underway and how the region's homebuilding compares with other large metros.

$6.9B

in new-construction and renovation permits

2025, as reported by applicants

3,916

new homes authorized in 2025

60,907 from 2016 through 2025

1,460

new-construction permits issued in 2025

1,393 in 2026 through Nov. 11

$730M

largest new-construction permit since Nov. 2024

O'Hare Satellite 1 concourse, Feb. 2026

01 · Largest new projects

The 100 largest new-construction permits of the past two years

New-construction permits issued from Nov. 12, 2024, through Nov. 11, 2026, ranked by the cost the applicant reported: $4.13B across 100 projects. Search, filter by type, neighborhood, ward or year, and click a column to sort.

Showing 1–10 of 100 permits · $4.13B in reported cost

#Project or address Type ↕Community area ↕Ward ↕Homes ↕units addedIssued ↕permit dateReported cost ▼applicant estimate What the permit covers
1 O'Hare Satellite 1 concourse10000 W O'Hare St · Permit 101071590 TransportationO'Hare41—Feb. 25, 2026$730M Superstructure, enclosure and interior of the new Satellite 1 concourse at O'Hare. Caissons, foundations and earth retention are on separate permits.
2 Bally's Chicago casino and hotel705 W Chicago Ave · Permit 101074828 Commercial and otherWest Town27—March 19, 2026$580M Interior buildout of a 7-story casino, parking and event center and a 34-story hotel tower. Core and shell ($396.2M), superstructure ($140M) and other phases are on separate permits.
3 O'Hare consolidated tunnel10000 W O'Hare St · Permit 101076890 TransportationO'Hare41—March 16, 2026$220M Tunnel linking the future O'Hare Global Terminal and the future Satellite 2 concourse.
4 931 N Halsted StPermit 101076997 Housing and mixed useNear North Side27464July 14, 2026$190M 46-story building with 464 homes, including 81 affordable units, and 209 parking spaces.
5 1904 W Adams StPermit 101084976 Commercial and otherNear West Side27—Oct. 28, 2026$177.3M Two-story building with a mezzanine for assembly, office and retail uses.
6 1144 W Loyola AvePermit 101077810 Commercial and otherRogers Park49—July 24, 2026$162M Six-story concrete building with office, assembly and storage space. Foundations are on a separate permit.
7 370 N Morgan StPermit 101059401 Housing and mixed useNear West Side27493July 14, 2025$155M 31-story building with 493 homes, ground-floor retail and three levels of parking. Three earlier phase permits list the same cost.
8 1022 W Jackson BlvdPermit 101082881 Housing and mixed useNear West Side34380Oct. 27, 2026$112M 25-story mixed-use building with 380 homes, ground-floor retail and parking.
9 Chicago Fire FC stadium at The 781331 S Wells St · Permit 101080382 Public, health, schools and sportsNear South Side3—June 3, 2026$102M Superstructure for a four-story stadium. Piles, foundations and enclosure ($94M) are on separate permits.
10 PsiQuantum building, Illinois Quantum and Microelectronics Park3733 E 87th St · Permit 101063081 Industrial, labs and data centersSouth Chicago10—Oct. 1, 2025$100M Core and shell of an 84,979-square-foot quantum computing facility. A cryoplant buildout ($30M) is on a separate permit.
Rows

Reported cost is an estimate the applicant files with the permit application, not a final construction cost, and phase permits for the same project can repeat or overlap. Big projects are often permitted in phases, so each project appears once, at its largest single permit; permits only for excavation, foundations, caissons, piles or other partial phases are left out unless they are a project’s largest. Homes are the change in housing units the city records on the permit, or the count in the permit description. Type is assigned from the permit description. Project names and short descriptions for the top 25 were written by hand; the rest are condensed from the permit text. Revision permits are left out. Source: City of Chicago building permits ↗

02 · New housing

Chicago authorized 60,907 new homes from 2016 through 2025

Permits for new homes in the city topped 14,000 in 2006, fell to 1,257 in 2009 during the housing downturn and recovered to 9,104 in 2016. Since then the city has averaged about 6,091 a year, with 3,916 in 2025. About 84% of homes permitted since 2016 are in buildings with five or more units.

New homes authorized by building permits in Chicago, 2006–2025

Housing units, City of Chicago, by size of building

2006

14,083

Low, 2009

1,257

Total, 2016–2025

60,907

2025

3,916

Buildings with 5 or more homesBuildings with 1 to 4 homes

Counts are housing units in new buildings authorized by permits issued in each year, including the Census Bureau’s estimates for any months not reported. A permit does not guarantee construction. Source: U.S. Census Bureau Building Permits Survey ↗

Where new homes are going up: the 15 community areas with the most new residential buildings permitted, 2016–2025

New-construction permits for residential buildings, City of Chicago. A single-family house and a 400-unit tower each count as one building. 7,766 such permits citywide.

Buildings with 2 or more homesSingle-family homes
West Town
752499 with 2+ homes · 253 single-family
Logan Square
606244 with 2+ homes · 362 single-family
North Center
516137 with 2+ homes · 379 single-family
Lincoln Park
472255 with 2+ homes · 217 single-family
Lake View
471273 with 2+ homes · 198 single-family
Grand Boulevard
383201 with 2+ homes · 182 single-family
Irving Park
36266 with 2+ homes · 296 single-family
Near West Side
291215 with 2+ homes · 76 single-family
Bridgeport
29063 with 2+ homes · 227 single-family
Woodlawn
265201 with 2+ homes · 64 single-family
Humboldt Park
23871 with 2+ homes · 167 single-family
Lincoln Square
21877 with 2+ homes · 141 single-family
Lower West Side
184152 with 2+ homes · 32 single-family
Avondale
17972 with 2+ homes · 107 single-family
Near North Side
142125 with 2+ homes · 17 single-family

The city’s permit data has no field for the number of homes, so buildings are classified from each permit’s written description. Garages, event tents and stages, revisions and foundation-only or other partial-phase permits are left out. Source: City of Chicago building permits ↗

03 · Construction value

$6.9B in new construction and renovation permitted in 2025

Applicants reported $3.0B in new-construction work and $3.9B in renovations and alterations on permits issued in 2025. Since 2019, renovation work has made up the larger share of reported value each year; new construction was larger in every year from 2013 to 2018.

Reported cost of new-construction and renovation permits, 2006–2025

Billions of dollars, not adjusted for inflation, by year the permit was issued

Peak, 2016

$9.0B

2025

$6.9B

Total, 2006–2025

$125B

New constructionRenovation and alteration

Totals add up applicant-reported costs, so a project permitted in phases can be counted more than once. Five renovation permits with placeholder or impossible costs (three at $6.67 billion, one at $1 billion for a restaurant buildout and one at $999,999,999) are excluded. Smaller permit types, such as express electrical, solar and sign permits, are left out because their reported costs include large keying errors. Source: City of Chicago building permits ↗

04 · Major projects

Where the biggest projects stand

Status as of November 2026 for large announced or approved projects in the city, from the developer, agency or news source linked on each card.

Under construction

Bally's Chicago

705 W Chicago Ave, River West (West Town)

$1.7 billion casino, 500-room hotel tower and 3,000-seat theater; topped off in spring 2026, with opening planned for spring 2027.

Bally's Corporation release ↗

Under construction

Illinois Quantum and Microelectronics Park

Former U.S. Steel South Works site, South Chicago

Broke ground Sept. 30, 2025, with PsiQuantum as anchor tenant; the state approved $500 million for the campus. First phase expected to finish in 2027.

Capitol News Illinois ↗

Under construction

Chicago Fire FC stadium at The 78

The 78, South Loop (Near South Side)

Owner-funded, 22,000-seat stadium approved by City Council; broke ground March 3, 2026, aiming to open for the 2028 MLS season. It is the first major building at The 78.

Chicago Fire FC ↗

Under construction

Red Line Extension

95th Street to 130th Street, Far South Side

5.5-mile CTA extension with four new stations (103rd, 111th, Michigan and 130th). Ground broken April 24, 2026; service expected in 2030.

CTA ↗

Under construction

O'Hare Satellite 1 concourse

O'Hare International Airport

Part of the O'Hare 21 expansion. The city issued a $730 million full building permit in February 2026, the largest new-construction permit in the past two years.

City of Chicago building permits ↗

Complete

Obama Presidential Center

Jackson Park, Woodlawn

Opened to the public in June 2026.

KPBS / NPR ↗

Approved, being replanned

Lincoln Yards

North Branch of the Chicago River, Lincoln Park and Bucktown

Approved in 2019. As of early 2026, original developer Sterling Bay had sold much of the unbuilt land and a new owner planned a smaller development.

Axios Chicago ↗

Not listed: Chicago Bears stadium: the team no longer pursues a site in the city (fall 2026 reporting focuses on Arlington Heights and Hammond, Ind.), so it is not listed. The University of Illinois Discovery Partners Institute pulled out of The 78 in October 2024; the Fire stadium is now its first major building.

05 · How the region compares

New homes permitted in the 10 largest metro areas

The Chicago metro area against the nation’s nine other largest metros. Pick a measure.

The Chicago metro ranks 10th of 10

Housing units authorized in 2025 per 1,000 residents

Houston
8.2
Dallas-Fort Worth
7.8
Phoenix
7.6
Atlanta
5.2
Miami
3.7
Washington
2.8
New York
2.2
Los Angeles
2.1
Philadelphia
2.0
Chicago
1.7

Housing units authorized by building permits, all building sizes. Each year uses the metro boundaries in effect at the time, so totals across years mix slightly different areas. Per-resident figures use July 1, 2025, population estimates. Sources: Census Building Permits Survey ↗, Census population estimates ↗

About the data

Building permits

Every permit the Department of Buildings has issued since 2006, updated daily; this page uses permits issued through Nov. 11, 2026. Cost, address, community area and work description come from each record. Chicago Data Portal: Building Permits ↗

Reported cost

The cost is the applicant’s estimate of the work when the permit is filed. It is not audited, is not a final construction cost and is not adjusted for inflation. Large projects are often split into foundation, superstructure, core-and-shell and interior permits, some of which repeat the full project cost. Chicago Data Portal: Building Permits ↗

Cleaning the totals

Construction value counts only new-construction and renovation/alteration permits. Five renovation permits with placeholder costs ($6,666,666,666 three times, $1,000,000,000 and $999,999,999) are excluded. Other permit types are left out because they include obvious keying errors, such as a $10 billion express electrical permit. Chicago Data Portal: Building Permits ↗

New homes

Housing units authorized by building permits come from the Census Bureau’s annual survey of permit offices, which counts units by building size and fills in any months a city does not report. The city’s own permit records have no unit field. Census Building Permits Survey ↗

Residential buildings by community area

New-construction permits are classified from their written descriptions as single-family homes or buildings with two or more homes. Garages, tents and stages, cranes, revisions, porch replacements, demolition and partial-phase permits (foundation, caisson, superstructure or enclosure only) are left out. The classification is ours and may miss some permits with unusual wording. Chicago Data Portal: Building Permits ↗

Metro comparison

Units authorized in each metropolitan statistical area from the Census annual metro files. Boundaries follow the official definition in effect each year, and Los Angeles uses its earlier metro code before 2014. Population is the Vintage 2025 July 1 estimate. Census population estimates ↗

Major projects

Status as of November 2026 from the developer, transit agency, team or news report linked on each card. Projects are listed only where a current status could be confirmed. CTA: Red Line Extension ↗